Design your switchboard

Tick what the home will power. We work out the circuits, breakers, RCDs and the enclosure size for you.

Supply and building

Count the levers on the main breaker by the meter: 1–2 means single-phase, 3–4 means three-phase.
It is written on the breaker by the meter, e.g. B25 or C40.
We estimate what you do not know, and the design says what an electrician has to verify.
With a lightning protection system a stronger surge arrester (T1+T2) is needed.

This is a basis for an electrician, not a design document. The result and the wiring must be reviewed and carried out by a qualified person.